More Beach To Love Re-Nourishment - Cape Hatteras Motel

Buxton Beach Nourishment Update – August 10, 2017

Thursday, August 10, 2017    2:00 p.m.

Weeks Marine resumed pumping sand this morning around 9:30 after two days of being shut down due to weather. The current marine forecast looks favorable for pumping the next several days.

The cutterhead dredge McCaskill will work on filling a 900-foot section of beach just north of Buxton during the next five days of pumping and will then proceed south through the village of Buxton.

In the meantime, Weeks Marine will be setting up a second subline approximately 5,000 ft north of the current subline.  A second dredge – a hopper dredge – is scheduled to arrive in Buxton next week, weather permitting.  Once the second dredge arrives and passes the Army Corps’ on-site pre-dredging inspection, pumping will start from the newly placed northern subline and proceed south.

 

[stop by our office to get your ‘soon to be collector item’ T-shirts].

We Got pumped T-shirts - Cape Hatteras Motel

 

Cape Hatteras Motel recently topped 11,155 fans on Facebook!

More Beach To Love Re-Nourishment - Cape Hatteras Motel

Buxton Beach Nourishment Update – August 7, 2017

August 7, 2017 3:30 pm

Coastal Science and Engineering (CSE), project manager for the Buxton Beach Nourishment Project, provided a detailed update at the Dare County Board of Commissioners’ meeting on Monday morning, August 7. CSE discussed production improvement measures that are being considered to expedite construction. They reported that Weeks Marine is hoping to bring a second dredge and will work through inspections and other requirements in an effort to bring the ‘B.E. Lindham’ hopper dredge on site in the next 10 – 15 days.

To view the PowerPoint presentation from CSE, click here.

Video of the presentation will be posted on MoreBeachtoLove.com as soon as available.

The next update will be issued as soon as work on the project resumes, or sooner if updated information becomes available

 

[stop by our office to get your ‘soon to be collector item’ T-shirts].

We Got pumped T-shirts - Cape Hatteras Motel

Cape Hatteras Motel recently topped 11,025 fans on Facebook!

More Beach To Love Re-Nourishment - Cape Hatteras Motel

Buxton Beach Nourishment Update – August 4, 2017

 August 4, 2017  5 p.m.

Weeks Marine pumped sand steadily this morning and shut down operations just before 3 p.m. due to rising sea conditions.

With the dredge shut down, Weeks Marine’s beach crew plans to disconnect the pipes in front of the Cape Hatteras Motel and grade the newly nourished beach and open it to the public.  When sea conditions subside, work will proceed a short distance to the north of the current landing point to complete the section between the previous landing point and the current landing point to the full design volume.  Once that section of beach is completed, pumping will resume south.

As work resumes south through the village of Buxton, remember to use caution, stay out of marked-off work zones, and adhere to instructions and signs posted by construction crews on site.  Please keep in mind that schedules and plans are subject to change.

The next update will be issued when work resumes.

 

[stop by our office to get your ‘soon to be collector item’ T-shirts].

We Got pumped T-shirts - Cape Hatteras Motel

 

 

Cape Hatteras Motel recently topped 11,020 fans on Facebook!

More Beach To Love Re-Nourishment - Cape Hatteras Motel

Buxton Beach Nourishment Update – August 2, 2017

Buxton Beach Nourishment Update … Wednesday, August 2, 2017 … Pumping Resumed

After having to shut down pumping operations on Friday morning, July 29 due to rough sea conditions, the pumping of sand resumed this afternoon just after 4:00 p.m. Construction is moving to the south and has approached the north end of Buxton.

Rough sea conditions on Friday, August 4 may lead to another delay over the weekend, but Weeks Marine estimates that if the current forecast holds, sea conditions will allow them to work for approximately four days over the coming week.

At this point, approximately 22% of the project has been completed. Updates will be provided as additional information is available.

 

 